Performing Earned Schedule Analysis with Project Professional 2013

The Earned Schedule (ES) Technique is an extension of the Earned Value Management (EVM) technique that just last year celebrated its 10th anniversary. Since 2003 it has been attracting new adopters continuously, recognized form the PMI as an emerging practice and included in the second edition of PMI’s EVM Standard.

In 2007 the pioneering macro to perform the Earned Schedule analysis with Microsoft Project was released. Now, the tool has been updated to be used with Project Professional 2013 and can be downloaded here. The old menu has been substituted by a new one located on the ribbon, and called EARNED SCHEDULE.

For more information about the use of the macro please look up this entry.